scope-cutting
CommunityCut scope ruthlessly, ship faster.
Authorassimovt
Version1.0.0
Installs0
System Documentation
What problem does it solve?
This Skill helps teams reduce project scope effectively by applying the "appetite-first" approach from Shape Up, ensuring that work fits within defined time constraints and delivers maximum value.
Core Features & Use Cases
- Appetite Setting: Define fixed time budgets (e.g., 1-2 weeks for small batches, 6 weeks max for big batches) before considering scope.
- Scope Hammering: Systematically question each feature's necessity using a series of prioritized questions (must-have vs. nice-to-have, shippable without, edge case vs. core path, baseline comparison).
- Shaping Down: Strategies for reducing scope by cutting breadth over quality, removing entire user surfaces, or time-bounding edge cases.
- Circuit Breaker: Implements the Shape Up principle that unfinished work is canceled by default if not shipped within a cycle, preventing zombie projects.
- Use Case: When a product team realizes a feature set is too large to complete in the allocated two-week cycle, they use this skill to identify and remove non-essential components, ensuring a valuable, albeit smaller, increment is shipped on time.
Quick Start
Use the scope-cutting skill to reduce the scope of the current project to fit a two-week appetite.
Dependency Matrix
Required Modules
None requiredComponents
references
💻 Claude Code Installation
Recommended: Let Claude install automatically. Simply copy and paste the text below to Claude Code.
Please help me install this Skill: Name: scope-cutting Download link: https://github.com/assimovt/productskills/archive/main.zip#scope-cutting Please download this .zip file, extract it, and install it in the .claude/skills/ directory.
Agent Skills Search Helper
Install a tiny helper to your Agent, search and equip skill from 223,000+ vetted skills library on demand.