disciplined-validation

Official

End-to-end validation with stakeholder sign-off.

Authorterraphim
Version1.0.0
Installs0

System Documentation

What problem does it solve?

Phase 5 of disciplined development validates that the system meets original requirements through system testing and user acceptance testing (UAT). It uses structured stakeholder interviews to gather sign-off and traces defects back to research or design phases.

Core Features & Use Cases

  • End-to-end validation of requirements via system tests and UAT.
  • Stakeholder interviews and sign-off documentation.
  • Defect traceability back to research/design for efficient remediation.

Quick Start

Run the disciplined-validation workflow to initiate Phase 5: load the research and design inputs, generate a system test suite, conduct system testing, perform UAT with stakeholder interviews, and produce the Validation Report. Then archive evidence and update the requirements-traceability matrix. Ensure all specialist outputs are linked in the Quality Gate.

Dependency Matrix

Required Modules

None required

Components

Standard package

💻 Claude Code Installation

Recommended: Let Claude install automatically. Simply copy and paste the text below to Claude Code.

Please help me install this Skill:
Name: disciplined-validation
Download link: https://github.com/terraphim/terraphim-skills/archive/main.zip#disciplined-validation

Please download this .zip file, extract it, and install it in the .claude/skills/ directory.
View Source Repository

Agent Skills Search Helper

Install a tiny helper to your Agent, search and equip skill from 223,000+ vetted skills library on demand.